A contractor has been selected to oversee repairs to the I-40 bridge between Arkansas and Tennessee.
The Arkansas and Tennessee Departments of Transportation have selected Kiewit Corporation, an Omaha, Neb.-based contractor to perform the repairs.
During a Monday afternoon press conference, ARDOT deputy director and chief engineer Rex Vines said that requests for qualifications had been sent out to contractors nationwide last week with proposals due by 10 a.m. on Monday. He said that a contractor was expected to be selected by the afternoon.
A significant fracture was discovered on the I-40 bridge, prompting a shutdown on May 11. Transportation officials are working to develop a solution to repair and reopen the bridge, which serves as a major freight corridor.
According to Vines, the two-phase plan involves adding structural steel plating to the outside of the bridge’s beam to stabilize it in Phase 1. Phase 2 is being refined, but Vines shared that the current plans are to use high-strength steel rods to span the fracture and strengthen the bridge’s beam, with the fractured section being removed and replaced.
A timeline on when the bridge will be reopened has not been announced. Vines told reporters that a timeline could be determined by the end of the week.
READ MORE: ARDOT Fires Employee Responsible for I-40 Bridge Inspections
